Project: LAN Cargo Aircraft Maintenance Hangar
Industry Served: Government, Aerospace, and Military,
Location: Miami, FL
Tons of Steel: 325
Project Overview
We fabricated 3 built-up plate welded members and other structural steel components for the 2 frames that support the hangar doors. We shipped the 3 built-up plate members to the job site in sections that are up to 110’ long and 10’ wide weighing 50 tons each. The building frame has a unique “Pop-Up” designed at the mid-point to allow for the aircraft tail section to enter the building above the roof line of the main roof.